A team of teams like never before: rehearsing a unique launch at ESA mission control


Teams at ESOC during ESA’s FLEX and Copernicus Sentinel-3C launch and early orbit (LEOP) simulations

On 15 September, two spacecraft will leave Earth together aboard the same launcher from Europe’s spaceport in Kourou: FLEX, ESA’s photosynthesis mission, and Sentinel-3C, Copernicus’ newest satellite monitoring Earth’s oceans, land, ice and atmosphere.

At ESA’s European Space Operations Centre (ESOC), two independent mission teams are preparing to operate the spacecraft in parallel in a closely coordinated effort. As launch approaches, they are rehearsing side by side to prepare not only for their own missions, but also for the moments when the two operations intersect.